Gravel supply and placement, asphalt paving and all related works, including concrete curb, sewer and guard rail, for new Ikea store which opened in fall 2017.
Five-month project that entailed the building of a 3.5km water collection canal complete with excavation, lining, measuring station and two HDPE lined settling basins.
Site preparation, utility supply and installation, asphalt paving as well as final landscaping and line painting for new employee parking lot at Halifax Stanfield Int'l Airport.
Removal of existing two-lane structure and placement of new precast concrete bridge over Lake Thomas, located on Fall River Road near the intersection of Highway 2.
Large-scale demolition, transport and disposal of contents for 32 Private Married Quarters (PMQ) complexes, along with 12 other buildings within the park.
Lot preparation for a massive, multi-phase subdivision in West Bedford, as well as the supply and installation of both water and sewer main services to each lot.